We always tie posts in with #4 re-bar. |
![]() |
We use a stitch nail procedure on all of our buildings that have a concrete slab. |
![]() |
Slab Pour |
![]() |
Starting of of finish grading. |
![]() |
Finish grading |
![]() |
Notice you barely see the imprints from the ready mix truck. That's what we call good compaction. |
![]() |
Roman slate stamped entry. Hopefully a nice surprise for Doug :). |
![]() |
New shop floor. |
![]() |
First stages of final prep. |
![]() |
Southeast corner of final building elevations. |
![]() |
West side building elevations. |
![]() |
Concrete anchor tie down system. |
![]() |
Back-fill material for concrete prep work. |
![]() |
The dreaded stump pile. |
![]() |
We tie in all post foundations with #4 re-bar. |
![]() |
Compaction fro final prep for concrete pour. |
![]() |
Entry pour. |