Site clean -up and removal of all out buildings on lot. |
![]() |
View of old out buildings on lot to be removed. |
![]() |
Ground compaction |
![]() |
Cleared lot along with ground compaction. |
![]() |
Ground prep and clearing the lot. |
![]() |
Lumber for roof and framing package arrives. |
![]() |
Post hole truck arrives, ready to begin. |
![]() |
Post holes dug and precisely measured. |
![]() |
Close-up view of both post holes dug. |
![]() |
Lumber package |
![]() |
Posts for foundation |
![]() |
Post plum and line. |
![]() |
Truss truck and trusses for roof. |
![]() |
Lifting roof framing. |
![]() |
Roof package lifted |
![]() |
Truss truck lifting the trusses. |
![]() |
The trusses are up and securely placed. The first phase is completed. |