| We always tie posts in with #4 re-bar. |
![]() |
| We use a stitch nail procedure on all of our buildings that have a concrete slab. |
![]() |
| Slab Pour |
![]() |
| Starting of of finish grading. |
![]() |
| Finish grading |
![]() |
| Notice you barely see the imprints from the ready mix truck. That's what we call good compaction. |
![]() |
| Roman slate stamped entry. Hopefully a nice surprise for Doug :). |
![]() |
| New shop floor. |
![]() |
| First stages of final prep. |
![]() |
| Southeast corner of final building elevations. |
![]() |
| West side building elevations. |
![]() |
| Concrete anchor tie down system. |
![]() |
| Back-fill material for concrete prep work. |
![]() |
| The dreaded stump pile. |
![]() |
| We tie in all post foundations with #4 re-bar. |
![]() |
| Compaction fro final prep for concrete pour. |
![]() |
| Entry pour. |