Crooked River Ranch Project / Mark Arthur and Nora Curtis Pole Building / November 26-30 2012

Many transformations took place this last week with Mark Arthur and Nora Curtis pole building. The building is all framed and the vapor barrier's were put up. This phase is always exciting, as it all starts to come together. 

Power Pole Removal
Another power pole removal
Power pole base
Interior Framing; Framed a 2 x 4 interior wall, so all door and window trims would match. 
Interior Framing for the fire wall.
More interior framing

Another 2 x 4 interior wall framed, so that it matches the window and door  trim.
Another view of the 2 x 4 interior wall framed.
Final finish on interior framing.
Another view of the final finish of interior framing
Exterior framing
More of the exterior framing.
Final finish on exterior framing.
Once framed, then the vapor barrier is put up.
Another view of the vapor barrier.
Building is all framed and the vapor barrier is put up.