![]() |
| Power Pole Removal |
![]() |
| Another power pole removal |
![]() |
| Power pole base |
![]() |
| Interior Framing; Framed a 2 x 4 interior wall, so all door and window trims would match. |
![]() |
| Interior Framing for the fire wall. |
![]() |
| More interior framing |
![]() |
| Another 2 x 4 interior wall framed, so that it matches the window and door trim. |
![]() |
| Another view of the 2 x 4 interior wall framed. |
![]() |
| Final finish on interior framing. |
![]() |
| Another view of the final finish of interior framing |
![]() |
| Exterior framing |
![]() |
| More of the exterior framing. |
![]() |
| Final finish on exterior framing. |
![]() |
| Once framed, then the vapor barrier is put up. |
![]() |
| Another view of the vapor barrier. |
![]() |
| Building is all framed and the vapor barrier is put up. |
















No comments:
Post a Comment