Terrebonne,Oregon Project / Terry and Brenda Shine's Pole Building / August 2012



This last week, Terry and the crew continue to make progress out in Terrebonne, on Terry and Brenda Shine’s pole building.  Our crew is doing a great job at getting the roof package up and the concrete slab poured. Everything is moving along nicely. It won’t be long until we see the end results, which is always exciting!


Roof package / Set-up on ground

Roof assembled on ground, before it's raised.

Roof after being assembled,getting ready to be lifted.

Lifting assembled roof package.

More of the roof being lifted.

More roof package

Both sides of roof have been lifted and placed.

Slab tie-ins for post foundation.

Ground prep for concrete slab.

Ground prep complete, ready for the concrete pour.

Concrete Pour

Finished Concrete Slab

Framed roof and concrete slab completed.