The crew getting the framing started. |
Framing |
Framing completed |
Almost ready for the doors. |
Ready for doors to be installed. |
Before the doors are installed, the concrete slab was poured. |
Concrete slab poured. |
Concrete slab completed. |
Gravel for the driveway. |
Side view of the final building. |
Another side view of final building. |
And...the other side of the final building. |
Here we have the completed pole building for Terry and Brenda Shine. |